Agoracom Blog Home

Posts Tagged ‘#Artisinal’

Client Feature: Tajiri Resources $TAJ.ca Embarks on Maiden Drill Program At Rio Project, Burkina Faso $GXS.ca $EDV.ca $IMG.ca $GUY.ca

Posted by AGORACOM at 9:23 AM on Friday, August 21st, 2020

Reo Gold Project in Burkina Faso is one of 2 Company making gold projects it its property portfolio.  

Maiden Drill Program Initiated: 

  • Drilling contractor hired to conduct up to 7000m of reverse circulation drilling.  
  • Drilling is expected to start within the next 2 weeks. 

Project Focus: Morley and K4-K5 Prospects  

Morley: Prior operator identified a potential high-grade gold bearing structure of 3-10m width and 400 metres in strike. 

Previous drill and trench exploration identified high grade gold; 

  • KRAC11 32m @ 17.5g/t from 2m,  
  • MRTR001(trench) 11m @ 7.97g/t,  
  • MRRC005 10m @ 9.63g/t from 74m,  
  • MRRC040 5m @ 16.9g/t from 33m 
  • KRC022 10m @7.55g/t from 16m 

There are clear signs of potential for a high grade near surface orebody similar in nature to other mines in the region. 

K4-K5: A large gold bearing system 4 x 5 km in size with 30,000m of previous drill data guiding current exploration. 

Targeting 20 new zones for exploration follow up that correlate with the following past results  

  • MRRC0047  13m @ 2.47g/t from  
  • MRRB1608  12m @ 3.23 from 4m 
  • MRRC0081  16m @ 1.95g/t from 7m, 
    • 6m @ 2.27g/t from 54m,  
    • 13m @ 2.19g/t from 85m 
  • MRRC0091  10m @ 3.47g/t from 25m 

Additionally, Tajiri will also test another 3-6 highly prospective targets with 1,500-2,000m of further drilling. 

FULL DISCLOSURE: Tajiri Resources is an advertising client of AGORA Internet Relations Corp.

Tajiri Resources $TAJ.ca to Begin Drilling at the 100% Owned Reo Gold Project, Burkina Faso $GXS.ca $EDV.ca $IMG.ca

Posted by AGORACOM at 3:28 PM on Thursday, August 20th, 2020

Past Drill Highlights:

  • KRAC11 32m @ 17.5g/t from 2m,
  • MRTR001(trench) 11m @ 7.97g/t,
  • MRRC005 10m @ 9.63g/t from 74m,
  • MRRC040 5m @ 16.9g/t from 33m
  • KRC022 10m @7.55g/t from 16m

VANCOUVER, BC, Aug. 20, 2020 /CNW/ – Tajiri Resources Corp. (the “Company”) (TSX VENTURE: TAJ) is pleased to announce that it has entered into an agreement with Sahara Natural Resources (or “Sahara’) to provide full support to the Company’s maiden exploration program on the Reo Gold Project located some 130km west of the country’s capital Ouagadougou in Burkina Faso.  Sahara is a full-service natural resource contractor and has been providing services globally since 2010. Sahara is accredited with all major stock exchanges.  The contract envisages 4,000- 7,000m of RC drilling and 1,500- 2,500m of diamond core drilling with all work to be conducted by and supervised by Sahara.   Drilling is expected to start within the next 2 weeks.

The specific focus of the drill campaign will be at the advanced Morley and K4-K5 prospects with drilling commencing at Morley, where the previous project owner Middle Island Resources identified through drilling and trenching a potential high grade gold bearing structure of 3-10m width and 400 metres in strike, The true extent of which remains unknown.  The perspectivity of Morley is clearly demonstrated by numerous drill and trench intersections such as:

  • KRAC11 32m @ 17.5g/t from 2m,
  • MRTR001(trench) 11m @ 7.97g/t,
  • MRRC005 10m @ 9.63g/t from 74m,
  • MRRC040 5m @ 16.9g/t from 33m
  • KRC022 10m @7.55g/t from 16m

A minimum of 2,000m of RC drilling is scheduled for Morley with the objective of infilling gaps in previous drilling to demonstrating down continuity and extending the zone along strike.  With an extensive collection of historical data to provide a blueprint the Company plans to both confirm and expand on the Morley prospect area in the upcoming program, as there are clear signs of potential for a high grade near surface orebody similar in nature to other mines in the region.

After drilling Morley additional work is planned to continue, without pause, at the K4/K5 prospect, where previous scout drilling of approximately 30,000 metres of various methods has identified a large gold bearing system that to date has been defined to be some 4 x 5 km in size.  In addition, in 2013 an IP survey was conducted which identified >20 discrete chargeability + resistivity anomalies which correlate with drill intersected mineralisation such as:

  • MRRC0047  13m @ 2.47g/t from
  • MRRB1608  12m @ 3.23 from 4m
  • MRRC0081  16m @ 1.95g/t from 7m,
    • 6m @ 2.27g/t from 54m,
    • 13m @ 2.19g/t from 85m
  • MRRC0091  10m @ 3.47g/t from 25m

The planned drill program will include 2,000-4,000m of shallow RC drilling to extend strike from historic drill intersections along the chargeability + resistivity anomalies.  Drilling will be on 50-100m strep outs and will test 2-3 of the chargeability + resistivity anomalies as proof of concept before the Company embarks on a resource drilling campaign.

In addition the Company will also test 3-6 deep, highly prospective, resistivity/chargeability IP targets with 1,500-2,000m of diamond core drilling to a depth of ~400m.  IP surveys have indicated the presence of 6 targets at depths of between 250m-400m below surface that are 2-4 times the intensity of shallower targets and appear 30-50m in width. To date drilling at K4-K5 has been generally shallow with only 5 diamond drill holes ranging from 71-190m depth having been completed.  As only one of these drill holes came close to testing a deeper IP target-  MRDD 003 drilled – to a depth of 170m – which intersected at the bottom of the hole a silica-chlorite altered granodiorite which returned 2m @ 16.8g/t between 158 and 160 metres.  MRDD 003 was drilled in a down dip direction, did not test the most prospective part of the resistivity/chargeability target, and therefore the possibility that a deeper a higher grade mineralisation is related to the highly altered subsurface intrusion and as such presents an exploration target of the highest priority.

On Behalf of the Board,

Tajiri Resources Corp.

Graham Keevil,
President, CEO