Agoracom Blog

Agoracom Welcomes Candente Copper with Canariaco Deposit, Included in Goldman Sachs 84 Top Copper Projects Worldwide $DNT.ca $CN.ca $FCX $BHP $TECK.ca

Posted by AGORACOM at 9:18 AM on Thursday, August 6th, 2020

CANDENTE HIGHLIGHTS:

  • Canariaco Included in Goldman Sachs 84 Top Copper Projects Worldwide
    • Cañariaco in Lowest Quartile of Copper Industry Production Costs
    • Definitive Feasibility 50% Complete
    • Higher grade throughput of 0.54% CuEqMill Feed Grade during first 3 years
    • Rising Copper and Gold Prices Impacting 2011 PFS
  • Fortescue Metals Group Ltd. owns 19.92% interest
    • Joint technical committee created to identify optimum strategy for Cañariaco development

Project Highlights:

Cañariaco Norte is a 100% owned feasibility-stage porphyry copper deposit

  • A single, contiguous, open-pit mineable deposit of 7.5B pounds Measured and Indicated,
  • 1.4B pounds Inferred Porphyry Copper Deposit
  • Annual production of 262,000,000lbs of copper, 39,000 oz gold & 911,000 oz silver over initial mine life of 22 yrs(@ 95,000 tpd)

Pre-Feasibility Study

  • NPV of US $922M and IRR of 17.3% (using US$2.25 copper and an 8% discount rate)
  • Payback of preproduction capital in 4.4 years (after-tax)
  • Copper Production of 262,000,000 pounds per year
  • Initial Mine life of 22 years+
  • Throughput rate of 95,000 tonnes per day
  • Operating costs of US$0.988 per pound of copper (including onsite/offsite costs, taxes and byproduct credits)
  • Minimal infrastructure required, excellent locations for all site facilities, close to existing highway (42km away) and power grid (57km away) & abundant water at site
  • Very strong community & regional support

The Cañariaco Norte Copper Project

  • Canariaco in Top 80 Deposits slated for Development according to Goldman Sachs
    • 42 in South America –Cañariaco Included
    • Cañariaco in Lowest Quartile of Copper Industry Production Costs
  • Large scale porphyry copper–gold-silver deposit in Northern Peru
  • 7.5B pounds Measured and Indicated, plus 1.4B pounds Inferred Porphyry Copper Deposit
  • Deposit and Scope of Project Development well defined by Pre-Feasibility Studies in 2011
  • Annual production of 262,000,000lbs of copper, 39,000 oz gold & 911,000 oz silver over initial mine life of 22 yrs(@ 95,000 tpd)
  • Operating costs of US$0.988 per pound of copper (including onsite/offsite costs, taxes and byproduct credits
  • Strong Government support

Resource and Mine Plan

123 Million tonnes @ 0.58% Cu Eq (0.4% Cu cutoff) Measured

752 Million tonnes @ 0.52% Cu Eq (0.3% Cu cutoff) M & Indicated

1.0 Billion tonnes @ 0.46% Cu Eq(0.2% Cu cutoff) M & I

Current Mine Plan 728.2 Million tonnes @ 0.46% CuEqMill Feed Grade

  • Higher grade throughput of 0.54% CuEqMill Feed Grade during first 3 years

Canariaco Price Sensitivities Chart

  • Rising Copper and Silver Prices dramatically Project Economics
  • Based on 2011 Pre-Feasibility Progress Report

Tags: , , , , , , ,

Comments are closed.