
WHY GARIBALDI RESOURCES CORP?
- $1.7 million in working capital as per latest financials (Apr 30)
- Attractive share structure
- no warrants, no major financings since 2009
- Drilling in progress – strong news flow from Mexico and B.C.

WHY GARIBALDI RESOURCES CORP?
LEADERSHIP. MOVING FORWARD. BUILDING VALUE.
GARIBALDI APPROACH AND ADVANTAGE IN MEXICO

Through the strength of its geological team and the use of cutting- edge technology and proprietary data, Garibaldi has built a foundation for lasting success in Mexico:
La Patilla Project
Rodadero North Project
NORTHWEST B.C. – DOMINANT LANDHOLDER IN EMERGING SHESLAY CAMP

Red Lion
Mount Sister Mary (MSM)
12 Month Stock Chart

Welcome to Q&A, a production of AGORACOM in which we ask shareholders to provide questions which will be answered directly by management. With us today is Dr. Chris D’Couto President of Neah Power Systems.
Neah Power Systems is a developer of fuel cell power solutions using proprietary, award winning technology for the military, transportation, and portable electronic devices.
$50M+ Invested into Neah Power Systems
Neah Power continues its aggressive efforts to commercialize proprietary and patented fuel cell technology. The Powerchipâ„¢ product and the Buzzbarrâ„¢ (CONSUMER) micro fuel cells have the potential to revolutionize the energy storage marketplace.




Xylitol Canada, Inc. emerged in 2004 as a reseller and distributor of Xylitol and Xylitol products. Based in Toronto, Ontario, the company continued to grow and develop additional brands under the names Sweet Diabetic Delight and Xylitol Canada. Realizing the market potential for high quality, readily available, and consistently priced Xylitol and Xylitol products, the Company broadened its strategic vision in 2009.
Realizing that the void in the Xylitol market was based on inadequate supply and lack of awareness, the company initiated a 2-tier business expansion plan that sought to solve both of these problems. With the vision of a full scale North American Xylitol production facility as a critical element of this strategy, the Company reached out to the Capital markets and formally went public in April of 2010. With the capital base to aggressively address the marketplace, the company immediately began executing its business plan.


September 4, 2014
by By JUSTIN PRITCHARD and SCOTT SONNER, Associated Press
RENO, Nev. — To bring electric cars to the masses, Tesla Motors will transform an expanse of desert where pioneers passed on their way to the California Gold Rush and wild mustangs still roam the hillside.
This time, the rush will be in Nevada, which Tesla chose over four other states as the site for a $5 billion factory that the carmaker projects will crank out enough high-tech car batteries to power 500,000 vehicles annually by decade’s end.
Nevada’s elected leaders still must deliver on the economic incentives they’ve promised, but if they do as expected, Tesla will open its massive factory at an industrial park outside Reno, according to a person familiar with Tesla’s plans. The person spoke on condition of anonymity because no official announcement had been made. An announcement was scheduled for Thursday afternoon at Nevada’s Capitol.
U.S. Senate Majority Leader Harry Reid, D-Nevada, acknowledged Thursday at his Clean Energy Summit in Las Vegas that Tesla was coming to Nevada, and said he had spoken with Nevada Gov. Brian Sandoval about it.
A state synonymous with gambling hit the jobs jackpot — Tesla has said the factory will employ about 6,500 people. That’s a welcome jolt for a tourism-based economy particularly hard hit during the Great Recession.
Tesla’s choice of Nevada over California, Texas, Arizona and New Mexico takes it a big step closer to mass producing an electric car that costs around $35,000 and can go 200 miles on a single charge. That range is critical because it lets people take most daily trips without recharging, a major barrier to the widespread adoption of electric vehicles.
The “gigafactory,†as Tesla calls the project, would bring the cost of batteries down by producing them on a huge scale. Its approximately 10 million square feet, equivalent to about 174 football fields, would be running by 2017. That is when Tesla hopes to introduce its Model 3,
At present, demand for electric vehicles is small.
Through August, automakers have sold just over 40,000 fully electric cars this year, up 35 per cent from a year ago, according to the auto website Edmunds.com. Factoring in plug-in hybrids, electric vehicles still account for just 3.6 per cent of all new car sales, a slight drop from last year. Still, government fuel economy standards that will require new cars and trucks to average 54.5 miles per gallon are expected to drive sales.
Gov. Sandoval’s office wouldn’t comment Wednesday on the gigafactory news, saying only that he would make a “major economic development announcement†Thursday. A spokesman for Tesla Motors Inc., based in Palo Alto, California, said company representatives would be at the Capitol in Carson City for the announcement but offered no other details.
Sandoval has declined to discuss incentives he has offered Tesla. Based on CEO Elon Musk’s public statements, the incentives likely total at least $500 million. The governor would have to call a special session of the Legislature to approve tax breaks, grants or other incentives of that magnitude.
This spring, Musk announced that the company would take the unusual step of spending millions to prepare sites in two states _ or perhaps even three _ before choosing a winner. The person familiar with Tesla’s plans told The Associated Press a second site still will be prepared, in case Nevada is unable to deliver the incentives it has promised, or possibly to build a second factory.
Tesla has done excavation and other site-preparation work at the Tahoe Reno Industrial Center, where it plans to build the factory, but had not publicly committed to building in Nevada until it tested what economic incentives other states offered. The centre is about 15 miles east of Sparks, a Reno suburb founded as a railroad town more than a century ago.
Aside from low tax rates and business-friendly workplace laws, Nevada offered plenty of sun and wind to generate “green†power. The industrial park is only about 200 miles along Interstate 80 from Tesla’s lone auto assembly plant in the San Francisco Bay Area. It’s also near a deposit of lithium, an essential element to produce the battery cells.
Reid said that ready supply was an important part of Nevada’s bid, and pointed to a $28.4 million Department of Energy grant in 2010 for a lithium carbonate and lithium hydroxide plant in Silver Creek, Nevada.
Competition for the factory has been intense among the states, which bid up their incentive packages in private negotiations with Tesla.
In California, where Tesla has its headquarters and manufacturing plant, the decision to build in the state next door stung.
“Tesla was using their business savviness to get states to compete against one another,†said state Sen. Ted Gaines, R-Roseville, a principal proponent of the project. “It’s just that I felt California had the inside track given our history of working in partnership with Tesla.â€
___
Associated Press writers Ken Ritter in Las Vegas, Juliet Williams in Sacramento, California, and AP Auto Writer Tom Krisher in Detroit contributed to this report.