Agoracom Blog Home

Posts Tagged ‘#smallcapstocks’

Durango Expands Whitney Northwest $DGO.ca

Posted by AGORACOM-JC at 9:07 AM on Friday, May 6th, 2016

Logo

  • Acquired additional ground north west of Tahoe Resources Inc.’s, (NYSE-TAHO, TSX-THO) Whitney Gold project and adjacent to Durango’s Whitney NW project near Timmins, Ontario
  • Ground was staked to extend the land position from the previously announced till sediment samples by Durango on March 2, 2016 and was acquired for staking costs.

Vancouver, BC / May 6, 2016 – Durango Resources Inc. (TSX.V-DGO), (the “Company” or “Durango”) announces that it has acquired additional ground north west of Tahoe Resources Inc.’s, (NYSE-TAHO, TSX-THO), Whitney Gold project and adjacent to Durango’s Whitney NW project near Timmins, Ontario. The ground was staked to extend the land position from the previously announced till sediment samples by Durango on March 2, 2016 and was acquired for staking costs.

About Durango

Durango is a natural resources company engaged in the acquisition and exploration of mineral properties. The Company has a 100% interest in the Mayner’s Fortune and Smith Island limestone properties in northwest British Columbia, the Decouverte and Trove gold properties in the Abitibi Region of Quebec, and certain lithium properties near the Whabouchi mine, the Buckshot graphite property near the Miller Mine in Quebec, the Dianna Lake silver project in northern Saskatchewan, the Whitney Northwest property near the Lake Shore Gold and Goldcorp joint venture in Ontario, as well as three sets of claims in the Labrador nickel corridor.

For further information on Durango, please refer to its SEDAR profile at www.sedar.com.

Marcy Kiesman, Chief Executive Officer

Telephone: 604.428.2900 or 604.339.2243

Facsimile: 888.266.3983

Email: [email protected]

Website: www.durangoresourcesinc.com

Forward-Looking Statements

This document may contain or refer to forward-looking information based on current expectations, including, but not limited to the development, commencement and completion of future exploration or project development programs and the impact on the Company of these events. Forward-looking information is subject to significant risks and uncertainties, as actual results may differ materially from forecasted results. Forward-looking information is provided as of the date hereof and we assume no responsibility to update or revise them to reflect new events or circumstances. For a detailed list of risks and uncertainties relating to Durango, please refer to the Company’s prospectus filed on its SEDAR profile at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CLIENT FEATURE: American Creek’s Treaty Creek Included In Seabridge Gold Plan To Take KSM Into Production $AMK.ca

Posted by AGORACOM-JC at 2:09 PM on Thursday, May 5th, 2016

AMK: TSX-V, ACKRF: OTC Pink

WHY AMERICAN CREEK RESOURCES?

  • Mineralization in the Treaty Creek claims area lies within the same broad hydrothermal system that generated the several deposits on the Seabridge Gold KSM and the Pretivm Brucejack properties that lie immediately southwest of the Treaty Creek claims
  • So far over 130 million ounces of gold, 800 million ounces of silver and 20 billion pounds of copper (all categories included), representing one of the greatest concentrations of metal value on the planet, have been delineated within the geological system shared by KSM, Brucejack, and Treaty Creek.

RECENT HIGHLIGHTS

  • Specimens from the structure averages 27,092 gm/tonne silver and 248 gm/tonne gold
  • Results from outcrop specimens of high grade material collected on its Electrum property from the Shiny Cliff vein on the North Face Showing Read More
  • TSX Venture Exchange approved the Amended and Restated Purchase Agreement regarding the Treaty Creek NSR that was previously announced April 13, 2016. Read Our Recent Blog

Exceptional Properties

Electrum Gold-Silver Property, British Columbia – 100% owned

The Electrum property has a rich history with some of the highest grade hand-mined ore mined in North America combined with excellent logistics. The property is located directly between two high-grad vein gold/silver mines; the past producing Silbak Premier mine and Pretiums high-grade Brucejack mine (production in 2017).All three lie within the Iskut mineral district (a particularly prolific part of the Canadian Cordillera) with numerous geological similarities between them.

The Electrum Property holds significant potential to attract mining companies when considering its high-grade nature combined with the exceptional logistics in place.

  • Located in the prolific Golden Triangle of northwestern British Columbia, an area encompassing mineral rich belts that host more than 43 past producing mines including Eskay Creek, Silbak Premier, Granduc and Big Missouri.It is a hotbed of activity with one new mine having come online in 2015 (Imperial Mines Red Chris) and another scheduled for 2017 (Pretium Brucejack) and at least three more world-class mining projects headed toward production.
  • Located in a particularly rich valley with 4 past producing commercial mines and a 5th in the adjacent valley.
  • Includes the historic East Gold Mine that had intermittent small-scale production of approximately 46 tonnes of ore with grades averaging 1,661 grams of gold per tonne and 2,596 grams of silver per tone (roughly 50oz gold with 75oz silver).
  • Mineralization is believed to be very similar to the silver-gold-base metal veins responsible for the precious metal mineralization found in the Silbak Premier Mine and the Big Missouri mines (located in same extended valley).
  • Pretiums Brucejack Summary Report (for exploration) compares itself geologically to the Silbak Premier mine as well.
  • Exceptional gold and silver assays including 440 g/t gold with 400 g/t silver over 0.52m, with numerous silver intervals of 583g/t, 501 g/t, 420 g/t, 384 g/t in core, and surface samples of 80.96 g/t gold with 80,818 g/t silver, 694 g/t gold with 550 g/t silver, 54.77 g/t gold with 14,903 g/t silver, 615 g/t gold with 616 g/t silver.
  • A very successful program was run in 2015 wherein:
    • A new approach focusing on high-grade was employed very successfully
    • A new zone of gold / silver mineralization was discovered
    • A better understanding of the property geology was obtained
    • Surface samples from the structure averages 27,092 gm/tonne silver and 248 gm/tonne gold



  • The program proved the Electrum Property has multiple high-grade gold-silver epithermal breccia vein systems and gave us a better understating of their sequencing.
  • Excellent logistics including road access, power located 2 km away and a bulk tonnage shipping port and supportive mining town located just40 km away in a mining friendly jurisdiction.

The high-grade ELECTRUM PROPERTY recently had a program run on it. CLICK HERE for the Electrum presentation and HERE for the 2015 drill program presentation. The highly mineralized gossans on the Electrum are shown in the image at the top of this page.

2015 Drill Program Presentation

Treaty Creek Gold-Copper Property, British Columbia – 51% Joint Venture

Treaty Creek Property


Treaty Creek is located in British Columbia’s prolific Golden Triangle; one of the richest areas of mineralization in the world with one new mine having come online in 2015 (Imperial Mines Red Chris) and another scheduled for 2017 (Pretium Brucejack) and at least three more world-class mining projects headed toward production.

Mineralization in the Treaty Creek claims area lies within the same broad hydrothermal system that generated the several deposits on the Seabridge Gold KSM and the Pretivm Brucejack properties that lie immediately southwest of the Treaty Creek claims. So far over 130 million ounces of gold, 800 million ounces of silver and 20 billion pounds of copper (all categories included), representing one of the greatest concentrations of metal value on the planet, have been delineated within the geological system shared by KSM, Brucejack, and Treaty Creek.

Seabridge Gold’s KSM is the world’s largest undeveloped gold/silver project by reserves while Pretium’s Brucejack is the highest grading undeveloped large-scale gold project in the world.KSM has just past the environmental and permitting stage while the Brucejack is in construction phase.
Treaty Creek is part of the same large hydrothermal system as it’s neighbours, hosts the same bedrock geology as its neighbours, the same magneto-telluric (MT) anomalies that proved to be large deposits on the neighbours claims, the same major fault system (Sulphurets) that is responsible for KSM’s deposits, and initial exploration and drilling show similar results to initial drilling on KSM.

The Treaty Creek property is in a strategic location as it’s included in Seabridge’s plan for the KSM to go into production. Seabridge has proposed twin tunnels that would take the KSM ore through American Creek’s Treaty Creek property to a processing plant and tailings pond.

Durango Expands Land Position At Nemaska $DGO.ca

Posted by AGORACOM-JC at 10:19 AM on Thursday, May 5th, 2016

Logo

  • Announced that it has applied via GESTIM online staking for additional claims in the Nemaska region
  • Now bringing its land holdings close to 3,000 hectares in the region, in addition to the 700-hectare land package under the joint venture arrangement announced by Durango on April 28, 2016

Vancouver, BC / May 5, 2016 – Durango Resources Inc. (TSX.V-DGO), (the “Company” or “Durango”) announces that it has applied via GESTIM online staking for additional claims in the Nemaska region, bringing its land holdings close to 3,000 hectares in the region, in addition to the 700-hectare land package under the joint venture arrangement announced by Durango on April 28, 2016.

Included in Durango’s land holdings are claims hosting mapped pegmatites as well as lake sediment samples in one claim group assaying 17.7ppm Li (1) Li, 15.4 ppm Li (2) 11.9ppm Li (3), and 10.2ppm Li (4). In comparison, a lake sediment sample taken from the Nemaska Lithium Whabouchi property in the same survey returned 10.9 ppm Li (5).

Marcy Kiesman, CEO of Durango, comments, “Our research and recent site visit have given us evidence to support the potential for lithium-bearing pegmatites on Durango’s land. Durango is expected to complete its NI 43-101 report shortly and will undertake a sampling program on the mapped pegmatites on the balance of the claims. The Company will keep investors updated as the exploration program develops for these claims in due course.”

LCT pegmatites, such as the pegmatite hosting the Whabouchi deposit, typically occur in groups, which consist of tens to hundreds of individuals and cover areas up to a few tens of square kilometres. Highly mobile elements such as lithium, rubidium, and cesium, and volatile components like boron and fluorine tend to alter the adjacent country rocks during LCT pegmatite emplacement. (6)

The technical contents of this release were approved by Case Lewis, P.Geo., a qualified person as defined by National Instrument 43-101. The property has not been the subject of a National Instrument 43-101 report.

References

  1. (1)SIGEOM Sample 1957080615 – lake sediment sample.
  2. (2)SIGEOM Sample 1957080610 – lake sediment sample.
  3. (3)SIGEOM Sample 1957011985 – lake sediment sample.
  4. (4)SIGEOM Sample 1957011945 – lake sediment sample.
  5. (5)SIGEOM Sample 1957012628 – lake sediment sample.
  6. (6)”A preliminary deposit model for lithium-cesium-tantalum (LCT) pegmatites”, USGS Open File Report 2013-1008.

About Durango

Durango is a natural resources company engaged in the acquisition and exploration of mineral properties. The Company has a 100% interest in the Mayner’s Fortune and Smith Island limestone properties in northwest British Columbia, the Decouverte and Trove gold properties in the Abitibi Region of Quebec, and certain lithium properties near the Whabouchi mine, the Buckshot graphite property near the Miller Mine in Quebec, the Dianna Lake silver project in northern Saskatchewan, the Whitney Northwest property near the Lake Shore Gold and Goldcorp joint venture in Ontario, as well as three sets of claims in the Labrador nickel corridor.

For further information on Durango, please refer to its SEDAR profile at www.sedar.com.

Marcy Kiesman, Chief Executive Officer

Telephone: 604.428.2900 or 604.339.2243

Facsimile: 888.266.3983

Email: [email protected]

Website: www.durangoresourcesinc.com

Forward-Looking Statements

This document may contain or refer to forward-looking information based on current expectations, including, but not limited to the development, commencement and completion of future exploration or project development programs and the impact on the Company of these events. Forward-looking information is subject to significant risks and uncertainties, as actual results may differ materially from forecasted results. Forward-looking information is provided as of the date hereof and we assume no responsibility to update or revise them to reflect new events or circumstances. For a detailed list of risks and uncertainties relating to Durango, please refer to the Company’s prospectus filed on its SEDAR profile at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Explor Closes a Private Placement of Unsecured Convertible Debentures $EXS.ca

Posted by AGORACOM-JC at 4:23 PM on Wednesday, May 4th, 2016

Exs_logo

  • Placement consists of an amount of $800,000 in capital in unsecured convertible debentures
  • Debentures bear interest at an annual rate of 8% and expire in one year from the closing of the Placement
  • Explor Resources invites investors to visit our booth at the following conference:
  • Booth #P28 (Pavilion) at the Big Event, Canadian Mining Expo in Timmins, Ontario, held at the McIntyre Community Centre from June 1 to June 2, 2016.

ROUYN-NORANDA, QUEBEC–(May 4, 2016) – Explor Resources Inc. (“Explor” or the “Corporation“) (TSX VENTURE:EXS)(OTCQX:EXSFF)(FRANKFURT:E1H1)(BERLIN:E1H1) announces that it has closed a non-brokered private placement of $800,000 (the “Placement”). The Placement consists of an amount of $800,000 in capital in unsecured convertible debentures (the “Debentures“). The Debentures bear interest at an annual rate of 8% and expire in one year from the closing of the Placement. Each holder of Debentures will be entitled to convert the principal amount of the Debentures in common shares of the Corporation, at a price of $0.15 per share. Therefore, the Corporation will reserve an aggregate number of 5,333,333 common shares of its capital stock in the event of the conversion of the full principal amount of the Debentures.

In connection with the Placement, a total of 426,667 non-transferrable warrants will be issued to two finders. Each warrant will be exercisable at $0.15 per common share of Explor for one (1) year from the closing date of the Placement.

The Debentures and any shares that may be issued on conversion of the Debentures, as well as any shares that would be issued on exercise of the finders’ warrants are subject to a hold period of four months and one day, expiring September 5, 2016.

The Placement is conditional to the final approval of the TSX Venture Exchange.

Explor Resources invites investors to visit our booth at the following conference:

Booth #P28 (Pavilion) at the Big Event, Canadian Mining Expo in Timmins, Ontario, held at the McIntyre Community Centre from June 1 to June 2, 2016.

The management team at Explor Resources Inc. looks forward to having you join us.

Explor Resources Inc. is a publicly listed company trading on the TSX Venture (EXS), on the OTCQX (EXSFF) and on the Frankfurt and Berlin Stock Exchanges (E1H1).

This Press Release was prepared by Explor. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the Policies of the TSX Venture Exchange) has reviewed or accepts responsibility for the adequacy or accuracy of this release.

About Explor Resources Inc.

Explor Resources Inc. is a Canadian-based natural resources company with mineral holdings in Ontario, Québec, Saskatchewan and New Brunswick. Explor is currently focused on exploration in the Abitibi Greenstone Belt. The belt is found in both provinces of Ontario and Québec with approximately 33% in Ontario and 67% in Québec. The Belt has produced in excess of 180,000,000 ounces of gold and 450,000,000 tonnes of cu-zn ore over the last 100 years. The Corporation was continued under the laws of Alberta in 1986 and has had its main office in Québec since 2006.

Explor Resources’ Flagship project is the Timmins Porcupine West (TPW) Project located in the Porcupine mining camp, in the Province of Ontario. Teck Resources Limited is currently conducting an exploration program as part of an earn-in on the TPW property. The TPW mineral resource (Press Release dated August 27, 2013) includes the following:

Open Pit Mineral Resources at a 0.30 g/t Au cut-off grade are as follows:
Indicated: 213,000 oz (4,283,000 tonnes at 1.55 g/t Au)
Inferred: 77,000 oz (1,140,000 tonnes at 2.09 g/t Au)
Underground Mineral Resources at a 1.70 g/t Au cut-off grade are as follows:
Indicated: 396,000 oz (4,420,000 tonnes at 2.79 g/t Au)
Inferred: 393,000 oz (5,185,000 tonnes at 2.36 g/t Au)

This document may contain forward-looking statements relating to Explor’s operations or to the environment in which it operates. Such statements are based on operations, estimates, forecasts and projections. They are not guarantees of future performance and involve risks and uncertainties that are difficult to predict and may be beyond Explor’s control. A number of important factors could cause actual outcomes and results to differ materially from those expressed in forward-looking statements, including those set forth in other public filling. In addition, such statements relate to the date on which they are made. Consequently, undue reliance should not be placed on such forward-looking statements. Explor disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws.

Explor Resources Inc.
Christian Dupont
President
819-797-6050
888-997-4630 or 819-797-4630
[email protected]
www.explorresources.com

Uragold Provides Update to Purevap(TM) Process, Roncevaux Program, Beauce Gold Spinout, Name Change and Upcoming AGM $UBR.ca

Posted by AGORACOM-JC at 9:08 AM on Wednesday, May 4th, 2016

Uragold_new

  • PyroGenesis Canada Inc. (“PyroGenesis”) has advised Uragold that the PUREVAPâ„¢ Quartz Vaporization Reactor (QVR) validation program, now in its beneficiation stage, will take slightly longer than originally anticipated
  • Uragold expects testing to recommence by the middle of May and expects to receive samples from PyroGenesis within 2 weeks of recommencement barring any further such delays.

MONTREAL, QUEBEC–(May 4, 2016) – Uragold (TSX VENTURE:UBR)(FRANKFURT:UGE)(OTC PINK:URAGD) would like to inform its shareholders that PyroGenesis Canada Inc. (“PyroGenesis”) has advised Uragold that the PUREVAPâ„¢ Quartz Vaporization Reactor (QVR) validation program, now in its beneficiation stage, will take slightly longer than originally anticipated.

The reason for the delay is not significant and was due to the failure of an off-the-shelf electrode. PyroGenesis has already redesigned a custom electrode and fabricating it this week.

Uragold expects testing to recommence by the middle of May and expects to receive samples from PyroGenesis within 2 weeks of recommencement barring any further such delays. At that time, Uragold will be shipping the samples to the independent laboratory for analysis. Generally speaking, Uragold anticipates receiving such results within two weeks but reminds investors the exact timeline is beyond its control.

Pierre Carabin, Director of Engineering of PyroGenesis stated: “Over the last month, 5 tests have been performed on the Purevapâ„¢ QVR system. In the first test, the functionality of the furnace was verified and we confirmed its ability to operate at high temperature. In the second test, operated at low power, we demonstrated for the first time, the production of silicon metal.” (Uragold April 19, 2016 Press Release)

Mr. Carabin then stated: “The next 3 tests were aimed at beneficiation part of the process. During these high power tests, unexpected mechanical failure of one of the off-the-shelf electrodes occurred. PyroGenesis has applied its know-how of plasma systems to redesign a custom electrode. A new electrode was designed and is being fabricated during the course of this week. The furnace will be back in operation by the middle of May at which point the testing program will resume.”

Bernard Tourillon, Chairman and CEO of Uragold stated “The extreme operating temperatures of the PUREVAPâ„¢ QVR process make for a very challenging environment (see Picture 1) but combining the recently announced breakthrough of making Silicon Metal with the proven leadership of PyroGenesis in developing and commercializing plasma processes makes this delay nothing more than a generally acceptable technical delay for such a testing program.”

Tourillon added “Events such as this are not uncommon when developing a new process but the following recent statement made by PyroGenesis CEO, P. Peter Pascali is the last word – ‘We look forward to the final results of our testing program and advancing to the pilot stage with Uragold.’

To this end, results achieved thus far justify that Uragold now move forward with a spring exploration campaign program on our Roncevaux Quartz Property in order to delineate a resource. This is the first step required for the preparation of a Preliminary Economic Assessment (“PEA”) of Roncevaux as the feed material for the PyroGenesis’ PUREVAPâ„¢ QVR process.

Picture 1: Purevapâ„¢ QVR system in operation (Source PyroGenesis)

http://media3.marketwire.com/docs/1053299.jpg.

ANTICIPATED TIMELINE FOR TESTING AND RESULTS

Having validated that the process works within the first 2 weeks of the program, the dynamic test protocols, which called for a first series of metallurgical tests to be completed at different operational settings in order to achieve the transformation of Uragold Quartz into Solar Grade Purity Si, should restart in the middle of May 2016.

The High Purity Silicon Metal produced by the reactor during this second stage tests will be sent to an independent laboratory for ICP – MS “Mass Spectrometry” analysis for final validation. Uragold anticipates a turnaround of about 2 weeks to get the analysis results.

ADDITIONAL FUND RAISING

Further to the company’s last press release announcing the raising of $520,000 from various instrument exercises, Uragold is pleased to report that, for the period April 26 – May 2 2016, $ 141,923.60 additional capital was raised through the exercise of 1,670,333 warrants.

BEAUCE GOLD SPIN OUT TO UNLOCK GREATER VALUE FOR CURRENT SHAREHOLDERS

On December 1, 2015, the Company first announced its intention to spin out its Beauce Gold Project for the purposes of unlocking greater shareholder value by separating the Company’s Silicon Metal and gold initiatives. Since that decision, the price of gold has risen $USD 250 (23.8%) per ounce from $1,050 to $1,300. The continued price appreciation in gold and gold exploration companies in 2016 gives management even greater confidence in the efficacy of this decision.

UPCOMING AGM – JUNE 22, 2016

Uragold wishes to inform shareholders that our AGM will be on June 22, 2016 at 10:00 AM. The meeting will be held at the offices of McCarthy Tétrault, 25th floor, 1000 Rue de la Gauchetière W, Montreal, Quebec, in the MTL/QC conference room. We invite all of our shareholders to attend, meet management, vote on agenda items and discuss the company’s milestones, as well as, future plans.

Other then the standard auditors and directors’ nominations, the other key subjects to be discussed and approved by shareholders will be:

  • Approving the signature of the letter of intent and financing through convertible debenture private placements with Stone River Capital LLC (Stone River) or other entity defined by Stone River;
  • Considering, if deemed appropriate, passing a resolution approving and authorizing the creation of a control person in connection with and resulting from the issuances of convertibles debentures and the conversions thereof;
  • Considering, if deemed appropriate, passing a resolution approving the Spin out of its Gold assets into a separate company whereby the Corporation will transfer into a new company (Newco) all its gold assets including all gold properties, all gold claims and all interest or participation therein (gold assets) and returning to its shareholders 80% of the shares received from Newco in payment for all gold assets sold and transferred;
  • Considering, if deemed appropriate, passing a special resolution approving the change of the name of the Corporation to Canada Silicon Resources Inc. or such other name that could be acceptable to the Director of Corporate Affairs of Industry Canada and the Directors;

About Uragold

Uragold Bay Resources is a TSX-V listed junior exploration company planning to become a vertically integrated and diversified High Value Specialty Materials Company. Uragold has announced plans to spin out its Beauce Gold Project – the largest placer gold deposit in eastern North America. Our Business model is focused on developing unique projects that can generate high yield returns and significant free cash flow within a short time line.

High Value Specialty Materials

In September 2015, PyroGenesis announced that it had filed for a provisional patent for the PUREVAPâ„¢ Quartz Vaporization Reactor (QVR) process, which it noted was able to produce silicon, at a lower cost, while generating less CO2 emissions than current processes.

On April 19, 2016, PyroGenesis announced that early test results of the PUREVAPâ„¢ QVR process have demonstrated that it can transform high purity quartz into silicon metal. The PUREVAPâ„¢ QVR validation program his now in its second stage whereby the operational parameters of the reactor are adjusted in order to achieve the transformation of Uragold Quartz into Solar Grade Purity Si.

Uragold, with its worldwide exclusive usage of PyroGenesis’ PUREVAPâ„¢ QVR, is endeavouring to become a vertically integrated Silicon Metal (98.5% Si), High Purity Silicon Metal (99.99% Si), Solar Grade Silicon Metal (6N Purity / 99.9999% Si) and/or Higher (9N Purity / 99.9999999% Si) producer.

The PUREVAPâ„¢ QVR process’s big advantage is its one step direct transformation of Quartz into High Purity Silicon Metal Solar Grade Silicon Metal and/or Higher Purity product, thereby potentially allowing Uragold to manufacture high value material for the same operating cost presently being paid by traditional producers to make Metallurgical Grade Si (98.5% Si) using the traditional arc furnace approach.

The Science Behind PyroGenesis PUREVAPâ„¢ QVR Process Is Solid:

  • Plasma arc based process can and has transformed High Purity Quartz into Mg Si.
  • Plasma arc based process can and is being used to purify Mg Si into higher value materials such as Sg Si.
  • Finally, refining Mg Si using an electron-beam furnace in a high vacuum-processing environment has proven the concept of the elimination of elements whose vapor pressures are higher than that of silicon.

What is unique and ground breaking is the combination of these three proven processes into one step.

A Green And Clean Company

Uragold, with its worldwide exclusive usage of PyroGenesis’ PUREVAPâ„¢ QVR will also be implementing a process to make Sg Si, which is estimated to generate 14.1 kg CO2 eq/Kg SG Si, versus the 54.0 kg CO2 eq/Kg SG Si of emissions generated by the Siemens process (90% of the present production process). This represents 75% fewer greenhouse gas emissions, which is justified by elimination of the emissions emanating from the use of chemicals, as well as, energy consumption from the additional purification step.

High Purity Quartz Properties

Uragold is also the largest holder of High Purity Quartz properties in Quebec, with over 3,500 Ha under claims. Despite the abundance of quartz, very few deposits are suitable for high purity applications. High Purity Quartz supplies are tightening, prices are rising, and exponential growth is forecast. Quartz from the Roncevaux property successfully passed rigorous testing protocols of a major silicon metal producer confirming that our material is highly suited for their silicon metal production.

About Our Beauce Gold Project – Preparing To Be Spun Out To Unlock Value

The Beauce Gold Project is a unique, historically prolific gold field located in the municipality of Saint-Simon-les-Mines in the Beauce region of Southern Quebec. Comprising of a block of 37 claims 100% owned by Uragold Bay Resources, the project area hosts a six (6) km long unconsolidated gold bearing sedimentary units (a lower saprolite and an upper brown diamictite) holding the largest placer gold deposit in eastern North America. The gold in saprolite indicates a close proximity to a bedrock source of gold providing significant potential for further exploration discoveries.

This press release contains certain forward-looking statements, including, without limitation, statements containing the words “may”, “plan”, “will”, “estimate”, “continue”, “anticipate”, “intend”, “expect”, “in the process” and other similar expressions which constitute “forward-looking information” within the meaning of applicable securities laws. Forward-looking statements reflect the Company’s current expectation and assumptions, and are subject to a number of risks and uncertainties that could cause actual results to differ materially from those anticipated. These forward-looking statements involve risks and uncertainties including, but not limited to, our expectations regarding the acceptance of our products by the market, our strategy to develop new products and enhance the capabilities of existing products, our strategy with respect to research and development, the impact of competitive products and pricing, new product development, and uncertainties related to the regulatory approval process. Such statements reflect the current views of the Company with respect to future events and are subject to certain risks and uncertainties and other risks detailed from time-to-time in the Company’s on-going filings with the securities regulatory authorities, which filings can be found at www.sedar.com. Actual results, events, and performance may differ materially. Readers are cautioned not to place undue reliance on these forward-looking statements. The Company undertakes no obligation to publicly update or revise any forward-looking statements either as a result of new information, future events or otherwise, except as required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Shares outstanding: 123,235,341

Bernard J. Tourillon, Chairman and CEO
(514) 907-1011

Patrick Levasseur, President and COO
(514) 262-9239
www.uragold.com

Carl Desjardins, Paradox Public Relations Inc.
(514) 341-0408

Nevada Energy Metals – Playing the Lithium Boom $BFF.ca

Posted by AGORACOM-JC at 3:20 PM on Tuesday, May 3rd, 2016

Bff_hub-2_copy

  • As prices soar and the lithium space becomes a frantic game to secure future supply to feed the lithium-dependent energy revolution, a new entrant is betting that Nevada has much more to offer beyond the obvious Clayton Valley basin
  • While the lithium boom unfolds in Nevada–the only state with brine-based lithium resources in production–Nevada Energy Metals (TSX-V:BFF) is scooping up acreage, eyeing a boom to rival that of US shale

LONDON, May 3, 2016 — As prices soar and the lithium space becomes a frantic game to secure future supply to feed the lithium-dependent energy revolution, a new entrant is betting that Nevada has much more to offer beyond the obvious Clayton Valley basin.

While the lithium boom unfolds in Nevada–the only state with brine-based lithium resources in production–Nevada Energy Metals (TSX-V:BFF) is scooping up acreage, eyeing a boom to rival that of US shale.

“The lithium business is not a flash in the pan; it is here to stay, and I am looking at it like the start of the oil boom in the U.S. when there were oil derricks up to every 50 feet,” industry veteran Malcolm Bell, Nevada Energy Metals’ (OTC Pink: SSMLF; Frankfurt: A2AFBV) advisory board member, told Oilprice.com.

The company is setting itself up as a project generator and incubator of lithium resources, casting a much wider net over future lithium resources and building a diversified portfolio that reduces risk.

Geology has everything to do with it, and the geothermal footprints are large.

“There are enough locations that have geological similarities to Clayton Valley in other parts of Nevada State,” Bell says.

Nevada Energy Metals has four properties: Clayton Valley BFF-1, Alkali Lake, San Emidio, and Teels Marsh West. Its Clayton Valley project abuts Albermarle’s Silver Peak Mine-the only producing mine in America, right in Tesla’s gigafactory backyard.

Its Alkali Lake earn-in agreement with Dajin Resources Corp. is one of the big trump cards, and Nevada Energy is fully funded to tap into this.

At Teels Marsh West, about 48 miles from Clayton Valley, the company has staked 100 pacer claims covering 2,000 acres-all 100% fully owned, with no royalties.

It’s also just expanded its portfolio in the San Emidio Desert, adding 69 claims to its land position, which now boasts 155 claims.

This isn’t a one-trick pony-it’s a unique junior exploration company with a number of diverse exploration targets to reduce investor risk. And it’s got the management experience to see its lithium incubation plans through.

Many believe Nevada is over-flowing with lithium-and this new entrant is positioning itself for a large share of our future’s “white petroleum” market.

By. James Burgess of Oilprice.com

SOURCE Nevada Energy Metals Inc.

Pacific North West Capital Terms to Acquire 100% Lithium One Project, Southeast Manitoba $PFN.ca

Posted by AGORACOM-JC at 11:32 AM on Tuesday, May 3rd, 2016

  • Option to acquire 100% of a strategic lithium project
  • Claims situated 8.5 km SE of the Tanco Mine Site
  • 40 historical surface pegmatites, many lithium bearing
  • Objective to develop an economic lithium hard rock project
  • Exploration planning in progress

May 3, 2016 Vancouver, Canada / Pacific North West Capital Corp. (“PFN”, the “Company”) (TSX.V: PFN; Frankfurt: P7J.F; OTCQX: PAWEF Further to the company’s news release (PFN April 21, 2016, News Release) whereby the Company had acquired, through option, 11 unpatented contiguous mining claims from Cliff Allbutt of Winnipeg, Manitoba, the Company would like to provide further details of the option. The claim area is 2,272 hectares (5,614 acres) and is situated 8.5 kilometres southeast of the Tanco Mine Site (the “Lithium One Project”). The Lithium One Project is located approximately 125 kilometres northeast of Winnipeg, Manitoba.

The Optionor has agreed to grant an option to the Company to acquire a 100% undivided interest in the Lithium One Project. In order to acquire a 100% interest in the Lithium One Project (subject to the Production Royalty), the Company will issue up to 400,000 shares (200,000 in 10 days and 200,000 by the first anniversary date) and keep the claims in good standing. The Agreement is subject to approval from the TSX Venture Exchange (the “Exchange”).

With respect to the Lithium One Project, a finder’s fee of 75,000 shares is payable to Carey Galeschuk. The finder’s fee is subject to Exchange approval.

All shares issued in connection with the acquisition and finder’s fee are subject to a four month and one day hold period from the date of issuance.

About The Company’s Lithium Division

The company’s new Lithium Division will focus on the acquisition, exploration and development of Lithium Projects in Canada. In the United States the company will use its wholly owned U.S.A subsidiary to acquire and develop projects in active mining camps in Nevada, Arizona and California.

Management believes that these new age metals, Lithium, PGM’s and Rare Earths, have robust macro trends with surging demands and limited supply. Going forward, this new division will explore for the minerals needed to fuel the demand for energy storage and other core 21st Century Technologies.

In addition to the lithium brine potential of the CV West Li Project in Nevada, the company has and is developing hard rock lithium projects in Canada (PFN April 24th, 2016 news release). The Lithium One Project in southeast Manitoba, is located 8.5 kilometers south of the Tanco Mine Site, North America’s richest and longest operating hard rock mine for tantalum, lithium and cesium.

Lithium and Platinum group metal prices have improved dramatically in recent months. Lithium supplies remain in deficit relative to their demand. Both metals groups are used for the expanding worldwide automobile industry (conventional and electric). In the case of PGM’s, demand is increasing for autocatalysts, a key component for reducing toxic emissions for automotive, gasoline and diesel engines. In regards to Lithium, there is an ever increasing demand for batteries in cellphones, laptops, electric cars, solar storage, wireless charging and renewable energy products.

About the company’s Platinum Group Metals Division

Achievements to date and future plans for River Valley are outlined below as follows:

  1. 1.PFN currently has 100% ownership in the River Valley Project, subject to a 3% NSR, with options to buy down
  2. 2.Completed exploration and development programs on the River Valley property include more than 600 holes drilled since year 2000 and several mineral resource estimates and metallurgical studies;
  3. 3.Results for the current (2012) mineral resource estimate are below;
  4. 4.2015 drill program confirms new high grade T2 discovery


Click Image To View Full Size

  1. 5.Exploration and development plans outlined for 2016
  2. 6.Ongoing strategic partner search for River Valley project
  3. 7.Results for the most recent Metallurgical Testwork Study are summarized below:

– Prepared by Tetra Tech (Wardrop)

– High Confidence: Measured plus Indicated = 72% of total

– Reported on PdEq basis: Pd=40% & Pt=20% of the payable metals

– Pd to Pt ratio = 2.5:1; Cu to Ni ratio = 3:1

– High Grade potential, particularly in the north part of River Valley deposit

– Resources under evaluation for development potential as open pit mining operation


Click Image To View Full Size


Click Image To View Full Size

  1. 8.Results for the 2015 discovery drill program on the T2 target are as follows:

-Drill hole intercepts much higher than the average grade of current mineral resource estimate

-Possible new mineralized zone at the north end of the River Valley deposit

-Show potential to take the River Valley PGM Project in a new direction

-More drilling required


Click Image To View Full Size

  1. 9. Exploration and Development Plans for 2016
  • -Mineral prospecting and geological mapping on surface-Drill programs targeted to add more higher grade-Geological interpretation and 2D/3D modelling of all drill and surface results

    -Application to the OPA’s Junior Exploration Assistance Program (JEAP) for 33% refund of all exploration expenditures up to $300,000.

    -Strategic Partner Search for River Valley

QUALIFIED PERSON

The contents contained herein that relates to Exploration Results or Mineral Resources is based on information compiled, reviewed or prepared by Dr. Bill Stone, Principal Consulting Geoscientist for Pacific Northwest Capital. Dr. Stone is the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical content.

Further Information: Tel: +1.604.685.1870 Fax: +1.604.685.8045

Email: [email protected], or visit www.pfncapital.com

Suite 101 – 2148 West 38th Ave., Vancouver, BC, V6M 1R9

On behalf of the Board of Directors

” Harry Barr ”

Harry Barr

Chairman and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements. This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results and are based on current expectations or beliefs. For this purpose, statements of historical fact may be deemed to be forward-looking statements. In addition, forward-looking statements include statements in which the Company uses words such as “continue”, “efforts”, “expect”, “believe”, “anticipate”, “confident”, “intend”, “strategy”, “plan”, “will”, “estimate”, “project”, “goal”, “target”, “prospects”, “optimistic” or similar expressions. These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company’s ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company does not undertake any obligation to review or confirm analysts’ expectations or estimates or to release publicly any revisions to any forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not place undue reliance on forward-looking statements.

AGORACOM Welcomes Tartisan Resources (TTC: CSE) – Situated in the Andes which hosts 12 operating mines, 3 of which are world class producers $TTC.ca

Posted by AGORACOM-JC at 8:43 AM on Tuesday, May 3rd, 2016

TTC: CSE

  • US $250,000 recommended work program
  • Grab samples of note:
    • 2.273 g Au/t
    • 1,814 g Ag/t
  • Gold and silver in Perú’s prolific North- Central Mineralized Belt
  • “La Victoria” lies within this 300 km belt along the Andes which hosts 12 operating mines, 3 of which are world class producers.
  • La Arena owned by Tahoe Resources, Lagunas Norte (Alto Chicama) owned by Barrick Gold Corporation (TSX:ABX) and Santa Rosa owned by Compañia Minera Aurífera Santa Rosa (COMARSA).
  • La Victoria has excellent potential to host high-grade oxide and sulphide epithermal Au, Ag vein systems as well as potential for a large, low-grade, disseminated Cu, Au and Ag (porphyry-type) deposit.

  • Situated in the District of Huandoval, Province of Pallasca, Department of Ancash in the Republic of Peru on the continent of South America; approximately 425 kilometers (km) north-northwest of Lima. It is located within the Instituto Geografico Nacional (IGN) map sheet 17-h Pallasca.
  • Claims are centered on Universal Transverse Mercator (“UTM”) coordinate system, Provisional South American Datum 1956 (“PSAD56″), zone 18L, 174202 meters (m) East and 9081240 meters North; or geographic coordinate system 77º 57′ 15″ of west Longitude and 8º 18′ 10” of south Latitude.

  • Located in a remote area of Ancash on the western slopes of the Peruvian Andes at elevations that vary from 3000 m to 4200 m above sea level.
  • Landscape includes rocky mountaintops emerging from wide grassy valleys carved by glacial activity (Figure 7.1a and 7.1b).
  • Fertile land is abundant at lower altitudes. The vegetation at lower altitudes includes eucalyptus and pine trees, pasture and garden vegetables whereas the vegetation above 4000 m is restricted to grasses such as the ichu, cactus and some flower species.
  • Temperature on the Property varies between -3 and 20 degrees celsius (“ºC”) with an annual average of approximately 13 ºC. There are only two seasons: the rainy season from November to March along with snowfall during this period, and the dry season from April to October which is also cold.

The Property is located about 10 hours away from Lima by truck with a travel distance of approximately 600 km. Exploration and mining activity can function year-round; however, it is expected that there will be down time during the rainy season because of the poor road conditions. Extreme caution is advised during this period. Figure 6.2 illustrates the route to the Property whereas the travel times, distances and road conditions are listed in Table 7.1.

Route Distance (km) Time (hours) Condition
Lima – Chimbote 440 5.75 Paved road
Chimbote – Santa 11 0.25 Paved road
Santa – Estacion Chuquicara 66 1 Paved road
Estación Chuquicara – La Galgada 30 0.5 Paved road
La Galgada – Pallasca 40 2 Maintained gravel road
Pallasca Property 6 0.5 Maintained gravel road

The nearest road to the San Markito and Victoria anomalies is approximately 3 km away, therefore, the Phase I exploration was performed using horses and donkeys as the main transport method. Water is not abundant within these areas but is available at higher elevations. Infrastructure improvements such as road, water reserve and electrical lines (if feasible) should be implemented before the Phase II exploration operations.

Hub On AGORACOM / Corporate Profile / Read Release

INTERVIEW: Durango Resources Discusses JV Agreement on Lithium Project Adjacent to Nemaska Lithium $DGO.ca

Posted by AGORACOM-JC at 8:16 AM on Tuesday, May 3rd, 2016

  • 100% interest in the NMX East, a lithium property tied to Nemaska Lithium Inc.’s (TSX.V-NMX) Whabouchi property in Quebec. The NMX East property has all season road access via the Route Nord.
  • Property is comprised of 23 claims which cover 1,200 hectares and is located within a few kilometres of Nemaska’s proposed mining pit.
  • Nemaska Lithium is developing the world’s newest lithium mine in Quebec and has signed agreements with its key stakeholders, gained the required permits and was recently awarded both Federal Environmental Approval and the Province of Quebec Mine Approval

Hub On AGORACOM / Watch Interview

 

Pacific North West Capital Announces Harry Barr, CEO And Dr. Bill Stone Participation on Discussion Panels at The 5th Annual Cleantech & Technology Metals Summit $PFN.ca

Posted by AGORACOM-JC at 9:14 AM on Monday, May 2nd, 2016

  • Chairmen and CEO, Harry Barr, and Principle Consulting Geologist of the PGM Division, Dr. Bill Stone have been asked to sit on discussion panels at the upcoming 5th Annual Cleantech & Technology Metals Summit – Invest in the Cleantech Revolution, on May 10-11th in Toronto, Ontario (www.CTMS2016.com)
  • Discussion panels will be on Green Energy Metals (Lithium) and PGM’s
  • Summit is focused on extending the knowledge and understanding the supply and demand of the “cleantech” global economy

May 2nd, 2016 /Vancouver, Canada – Pacific North West Capital Corp. (“PFN”, the “Company”) (TSX.V: PFN; Frankfurt: P7J.F; OTCQX: PAWEF announces that the company’s Chairmen and CEO, Harry Barr, and Principle Consulting Geologist of the PGM Division, Dr. Bill Stone have been asked to sit on discussion panels at the upcoming 5th Annual Cleantech & Technology Metals Summit – Invest in the Cleantech Revolution, on May 10-11th in Toronto, Ontario (www.CTMS2016.com).

The discussion panels will be on Green Energy Metals (Lithium) and PGM’s. The summit is focused on extending the knowledge and understanding the supply and demand of the “cleantech” global economy. InvestorIntel will host over a dozen expert panels and speakers from public market companies around the world. The panels will address investors and cleantech funds who invest in companies that explore and develop 21st century technology metals.

Management previously announced (April 6th, 2016, April 14th, 2016, April 21st, 2016, April 25th, 2016) that PFN has developed a Lithium and Rare Earth Division. The Company’s management team has added an additional “Green Metal” to its existing Platinum group metals (PGM’s) division. These new age metals, Lithium, PGM’s and Rare Earths, have robust macro trends with surging demands and limited supply. Going forward, this new division will explore for the minerals needed to fuel the demand for energy storage and other core 21st Century Technologies.

About The Company’s Lithium Division

The company’s new Lithium Division will focus on the acquisition, exploration and development of Lithium Projects in Canada. In the United States the company will use its wholly owned U.S.A subsidiary to acquire and develop projects in active mining camps in Nevada, Arizona and California.

The company is focusing on hard rock lithium mineralization potential of southeastern Manitoba (PFN April 21st, 2016 news release) in the vicinity of the Tanco Mine Site, North America’s richest and longest operating hard rock mine for tantalum, lithium and cesium. Recently the company optioned a Lithium Brine Project (PFN April 25th, 2016 News Release)

Lithium and Platinum group metal prices have improved dramatically in recent months. Lithium supplies remain in deficit relative to their demand. Both metals groups are used for the expanding worldwide automobile industry (conventional and electric). In the case of PGM’s, demand is increasing for autocatalysts, a key component for reducing toxic emissions for automotive, gasoline and diesel engines. In regards to Lithium, there is an ever increasing demand for batteries in cellphones, laptops, electric cars, solar storage, wireless charging and renewable energy products.

About the company’s Platinum Group Metals Division

Milestones to date and future plans for River Valley are outlined below as follows:

  1. 1.PFN currently has 100% ownership in the River Valley Project, subject to a 3% NSR, with options to buy down
  2. 2.Completed exploration and development programs on the River Valley property include more than 600 holes drilled since year 2000 and several mineral resource estimates and metallurgical studies;
  3. 3.Results for the current (2012) mineral resource estimate are below;
  4. 4.2015 drill program confirms new high grade T2 discovery


Click Image To View Full Size

  1. 5.Exploration and development plans outlined for 2016
  2. 6.Ongoing strategic partner search for River Valley project
  3. 7.Results for the most recent Metallurgical Testwork Study are summarized below:

– Prepared by Tetra Tech (Wardrop)

– High Confidence: Measured plus Indicated = 72% of total

– Reported on PdEq basis: Pd=40% & Pt=20% of the payable metals

– Pd to Pt ratio = 2.5:1; Cu to Ni ratio = 3:1

– High Grade potential, particularly in the north part of River Valley deposit

– Resources under evaluation for development potential as open pit mining operation


Click Image To View Full Size


Click Image To View Full Size

  1. 8.Results for the 2015 discovery drill program on the T2 target are as follows:

-Drill hole intercepts much higher than the average grade of current mineral resource estimate

-Possible new mineralized zone at the north end of the River Valley deposit

-Show potential to take the River Valley PGM Project in a new direction

-More drilling required


Click Image To View Full Size

  1. 9. Exploration and Development Plans for 2016
  • -Mineral prospecting and geological mapping on surface-Drill programs targeted to add more higher grade

    -Geological interpretation and 2D/3D modelling of all drill and surface results

    -Application to the OPA’s Junior Exploration Assistance Program (JEAP) for 33% refund of all exploration expenditures up to $300,000.

    -Strategic Partner search for the River Valley Project

For further information, please see the press releases dated Apr 6th, 2016, April 14th, 2016, April 24th by visiting PFN’s website at www.pfncapital.com, or email us at [email protected]

On behalf of Management and the Board of Directors, I wish to thank our shareholders for their patience and continued support over the last 5 years as we look forward to a strong recovery in the Junior Mining industry.

QUALIFIED PERSON

The contents contained herein that relates to Exploration Results or Mineral Resources is based on information compiled, reviewed or prepared by Dr. Bill Stone, Principal Consulting Geoscientist for PFN. Dr. Stone is the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical content.

Further Information: Tel: +1.604.685.1870 Fax: +1.604.685.8045

Email: [email protected], or visit www.pfncapital.com

Suite 101 – 2148 West 38th Ave., Vancouver, BC, V6M 1R9

On behalf of the Board of Directors

Harry Barr

Chairman and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements. This release contains forward-looking statements that involve risks and uncertainties. These statements may differ materially from actual future events or results and are based on current expectations or beliefs. For this purpose, statements of historical fact may be deemed to be forward-looking statements. In addition, forward-looking statements include statements in which the Company uses words such as “continue”, “efforts”, “expect”, “believe”, “anticipate”, “confident”, “intend”, “strategy”, “plan”, “will”, “estimate”, “project”, “goal”, “target”, “prospects”, “optimistic” or similar expressions. These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company’s ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements. The Company does not undertake any obligation to review or confirm analysts’ expectations or estimates or to release publicly any revisions to any forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. Investors should not place undue reliance on forward-looking statements.